Post-Completion Defect Management Software
Protect your project legacy long after handover.
Emails, spreadsheets, and inboxes won't cut it during the defect liability period. Visibuild's Post-Completion module gives your team the structure to manage every DLP defect from first report to final sign-off, with the full build history already there when you need it.
Built for the Defect Liability Period
One system to manage every post-PC defect, from receipt to resolution.
Consolidating warranty and defect liability period management in a single system eliminates spreadsheet chaos and reduces defect resolution time. Visibuild’s structured workflows protect your margins while building purchaser confidence through transparent, auditable tracking.





Defect intake
Defects come in through a branded purchaser portal, or are escalated directly from a ticket. Every submission is captured with the detail your team needs to act: location, description, photos, submitter contact.

Triage and assignment
Your team reviews each defect, links it to the relevant build records, and assigns it to the responsible trade, with a clear deadline and full context attached from the start.

Resolution and evidence
The assigned trade updates status, attaches photos, and submits the fix for review, all within Visibuild. No back-and-forth emails. No chasing for updates.

Close-out and audit trail
Your team reviews the resolution, closes the defect, and retains a complete digital record, timestamped, photo-verified, and linked back to the original build data. The kind of record that wins disputes before they start.

Transparent live dashboards
Dashboards give the entire PC team, purchaser and client instant visibility on progress, close-outs, and trends


When issues go quiet,
reputations take the hit.
Handing over a project doesn’t mean the work is done. For post-completion teams, it’s just the beginning, and without a clear system, it quickly becomes a mess.
Visibuild links every post-completion defect to the specific inspections, sign-offs, and trade records captured during construction, so the context is already there. Faster resolution. Fewer disputes. A complete audit trail from build through DLP.
Built for real roles
Designed for every team that cares
for what happens after PC.
Why its better with Visibuild
Every capability your team needs
to manage the defect liability period with confidence.
Requests flow in and convert to managed defects without double-handling
Every defect connected to build-phase inspections, sign-offs, and subcontractor records
Triage, assign, action, review, and close with full accountability at every step
Every resolution documented with timestamped proof
Identify repeat issues by trade, location, or defect type
Keep purchasers informed throughout, without the email back-and-forth
The only truly connected project lifecycle software
Handing over a project doesn’t mean the work is done. For post-completion teams, it’s just the beginning, and without a clear system, it quickly becomes a mess.
The DLP Tool box
The features that make a big impact

Internal & Public Replies

Multi-reviewer Workflows

DLP Ticket Categorisation
Frequently Asked Questions
Visibuild Construction Post Completion Management Software
How does Visibuild improve construction defect liability period?
Emails and spreadsheets often leave defects unresolved. Visibuild’s DLP management software centralises communication, assigns clear ownership, maintains complete audit trails, and gives purchasers a branded portal to log and track issues transparently, making closeout faster and more compliant with warranty obligations.
How does Visibuild protect your reputation after handover?
By centralising warranty and defect closeout, Visibuild ensures no issue goes missing. Purchasers stay informed, subcontractors stay accountable, and your brand earns trust long after handover.
Can subcontractors and clients use Visibuild directly?
Yes. Purchasers log issues via a client portal, and subcontractors update defect status in real time. This creates visibility across the whole team and reduces delays in warranty and DLP management.
How does post-completion management connect with construction QA?
Every ticket in Visibuild links back to your construction QA records. That means repeat issues can be identified, warranty costs reduced, and lessons learned carried forward into future projects.







